All plays

Play 50 · Trade, logistics and hardware

ForCompliance test labsToThe hardware founder

Your FCC grant cleared. Europe is next

A seven-step play for a product compliance test lab. It starts from FCC equipment authorization, stacks Kickstarter and Firecrawl on top, and ends in a message to the hardware founder that is useful before anyone replies.

Installs this workflow, five project tables and a draft campaign. Source access and any external outputs are checked before research.

Category
Trade, logistics and hardware
Sources
3
Steps
7

The workflow

  1. TriggerFCC equipment authorizationNew grants and the radio modules inside
  2. Evidence
  3. Artifact
    What you hand overA CE and UKCA test plan for the same radio configuration, priced, with a timeline to their launch.
  4. Contact
    GliderFinds the hardware founder, with a verified work email and a phone
  5. Message
    Send itFrom your own mailboxes, evidence attached

Why it earns attention

A hardware company that just got its FCC grant usually plans to sell abroad next. Testing the same radio for Europe and the UK is the obvious next step, and timing it to their launch matters.

The play in seven steps

  1. 01

    Catch the FCC grant

    FCC equipment authorization
    What you pull
    New equipment authorizations: grantee, product, date, and the radio modules and frequencies.
    Why it matters
    A grant means the product is about to ship in the US. The radio details define the European testing.
    Example

    GPS tracker · granted Oct 28 · LTE-M and Bluetooth modules

  2. 02

    Check if they sell abroad

    Kickstarter
    What you pull
    The campaign's backer locations and promised shipping countries.
    Why it matters
    Backers in the UK and EU are a promise the company has to keep, and it needs CE and UKCA marks to do it.
    Example

    30% of backers in UK and EU · spring delivery promised

  3. 03

    Confirm the plan

    Firecrawl
    What you pull
    The company's site: shipping countries and launch dates.
    Why it matters
    It confirms the international plan and the deadline.
    Example

    Pre-orders open for UK and Germany · ships in spring

  4. 04

    Build the test plan

    Your artifact
    What you build
    The tests the same radio configuration needs for CE and UKCA, pricing, and a timeline that finishes before their launch.
    Why it works
    It reuses what they already know from FCC testing and shows a clear path to their date.
    Example

    Radio, EMC and safety · priced · 6 weeks · done before the spring launch

  5. 05

    Check before you send

    Pre-certified modules change what testing is needed. Check the module certifications before quoting, and do not imply the FCC grant covers Europe.

  6. 06

    Find the hardware founder in Glider

    Glider
    Search for
    Hardware leadFounderHead of complianceOperations lead
    Why them
    The hardware lead manages certification. The founder owns the launch date.
    What you get
    A work email and a direct phone, with the email verified before it goes into a sequence.
  7. 07

    Send the evidence, then run the first test

    • Facts from the data (the number is the step)
    • What you built for them
    • One small ask
    Why it works
    It knows their product and their promise to backers, and shows they can make the date.
    First test
    Twenty new grants from companies with international shipping on their site.
    Success looks like
    Two test engagements out of fifteen new grants.

The sample message is hypothetical and its numbers are illustrative. Verify every claim, date and rule before sending.

Sources used

The three sources this play names. Each links to the other plays that use it.

All 63 GTM plays

Run this play with Glider.

Deploy the full workflow into a project. Conway checks your scope and source access, builds the evidence, and prepares outreach for review.